SB320: Relating to power duration requirements in emergency contingency plans adopted by end stage renal disease facilities.
Filed 2026-11-10 · Author: Miles
- The bill affects end stage renal disease facilities, which provide dialysis care to people with kidney failure.
- Today, these facilities must have an emergency plan with an on-site generator and fuel for at least 24 hours.
- The bill raises the required backup power time from 24 hours to at least 72 hours.
- A facility could meet this with an on-site fuel source holding enough fuel to run the generator 72 hours.
- Or a facility could use an on-site battery-powered generator with enough capacity to power the facility for 72 hours.
- As today, the fuel amount is based on the electrical load demand on the emergency generator.
- As today, the plan must keep potable water on-site to run the water treatment system for 24 hours.
- Each facility must update its emergency contingency plan to meet the new rule by December 1, 2027.
Summary written with AI from the bill’s official text as filed. The official text is the one that counts.