SB33: Relating to the recovery of costs related to providing electricity service to customers at a computational load site.
Filed 2026-11-09 · Author: Zaffirini
- The bill covers customers at a "computational load site," such as a data center, and how their electricity costs are shared.
- A computational load site is one or more buildings at one location that mainly hold computer equipment.
- That equipment is used for software services, artificial intelligence, virtual currency transactions, or other data center computing.
- The site must also be supplied through electrical equipment connected to the bulk power system.
- Today, the Public Utility Commission of Texas must make large load customers help pay the utility's costs to connect them.
- Today, co-ops and city-owned utilities without customer choice pass reasonable connection costs to large load customers.
- For costs not recovered that way, the commission must set up a system for transmission costs from these sites.
- Those transmission costs would go to a separate rate class made up only of computational load site customers.
- Each electric utility providing distribution service to these customers must use a rate method set by the commission.
- The commission's system may require minimum demand charges, contract terms it specifies, or other requirements, so other customers do not pay these costs.
- The commission must adopt or revise its rules to carry out these changes by September 1, 2028.